- Final Regulation (This is the final Federal regulation dated 01/24/2011)
- Correction 1 to Final Regulation (pdf) (This action corrects technical errors in the Final Regulation)
- Correction 2 to Final Regulation (pdf) (This action amends the requirements for pressure vacuum vent valves for vapor balance systems)
- Work Practice Standards for all GDF (pdf) (This lists the work practice standards that all GDF must follow to reduce vapor releases to the atmosphere)
- Table 1 to Subpart CCCCCC (pdf) (This lists the requirements for vapor balance systems, which must be installed at GDF with a monthly throughput of 100,000 gallons or more)
- Table 2 to Subpart CCCCCC (pdf) (This lists the requirements for gasoline cargo tanks unloading gasoline at GDF with a monthly throughput of 100,000 gallons or more)
- CARB Vapor Recovery Test Procedure TP-201.1E (This is the link to the leak rate and cracking pressure of pressure/vacuum vent valves test method)
- CARB Vapor Recovery Test Procedure TP-201.3 (pdf) (This is the link to the static pressure performance test method)
- EPA Brochure (This is the Federal brochure describing the Federal regulation)
- Gas Distribution NESHAP 6C (Stage I) - Informational Video
Tags