This webpage is no longer maintained. It may be useful as background information or to provide a historical perspective on a topic or project.  

Bureau of Land and Waste Management

CERCLA and Site Remediation for Operable Unit 2 (OU-2)

Progress reports on Feasibility Study (2009-2011)

2011
2010
2009

Additional Information on the Site Clean-Up

Bureau of Air Quality

On December 11, 2014, AVX submitted an application to DHEC’s Bureau of Air Quality (BAQ) for a conditional major operating permit to replace its existing Title V operating permit due to significant changes in facility operations. These changes included a decline in production levels and the facility’s reclassification as an area source for hazardous air pollutant (HAP) emissions after the removal of ethylene glycol monobutyl ether (EGBE) from the list of federal HAPs. The facility also requested a federally-enforceable limit on its volatile organic compound (VOC) emissions to less than major source thresholds. There was no new construction associated with the application. 

On August 18, 2015, the BAQ issued Conditional Major Operating Permit Number CM-1340-0002, replacing the facility’s Title V Operating Permit previously issued on April 17, 2013. The conditional major operating permit was subsequently updated on February 7, 2019.  

Previous Title V Operating Permit

Title V Operating Permit Renewal Application - September 13, 2010
  1. Permit Renewal Application Summary
  2. Process Description
  3. Emission Calculations
  4. Regulatory Applicability Analysis

Appendices

Source Tests and Modeling

Bureau of Water

NPDES and Land Application Permit

Coastal Zone Consistency Certification - November 19, 2012

Underground Injection Control Permit - July 20, 2009


Compliance Inspection Reports

Air Quality

Water Quality

Hazardous Waste

Community Meeting - March 14, 2013

This meeting was held to update the community on the proposed air (Title V) & water (NPDES) renewal permits and the progress of the groundwater clean-up. There were three brief presentations and time for questions and answers. Below are the three presentations:

Community Updates